Wall installation (Caspia 2 – Puncak Iskandar) / Mohd Alif Aiman Azemi

Nowadays, the construction industry has been rapid and advanced. This report will discuss about construction wall of the selected case study, Caspia 2 – Puncak Iskandar. It produced refer on experience for four months stationed on the site of the construction project. This report divides a few parts...

詳細記述

保存先:
書誌詳細
第一著者: Azemi, Mohd Alif Aiman
フォーマット: Student Project
言語:English
出版事項: 2016
主題:
オンライン・アクセス:https://ir.uitm.edu.my/id/eprint/57007/1/57007.pdf
https://ir.uitm.edu.my/id/eprint/57007/
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!