Dilapidation survey of basement for demolished work / Raden Heedhir Abdul Rahman
Practical report is made about the process I have been through for 4 month of practical training. This report is about all things I done from the first day I come to work at the practical training place until the last day of my practical training. This report consists of four parts which is the comp...
Saved in:
主要作者: | Abdul Rahman, Raden Heedhir |
---|---|
格式: | Student Project |
語言: | English |
出版: |
2015
|
主題: | |
在線閱讀: | https://ir.uitm.edu.my/id/eprint/60874/1/60874.pdf https://ir.uitm.edu.my/id/eprint/60874/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Pre and post dilapidation survey at Jalan Gombak / Safiah Che Ab Rahman
由: Ab Rahman, Safiah Che
出版: (2015) -
Pre-construction and post construction dilapidation survey / Muaz Ghazali
由: Ghazali, Muaz
出版: (2017) -
Dilapidation survey/ Manzurul Hasan Marzuki
由: Marzuki, Manzurul Hasan
出版: (2015) -
Repairing work / Nazatul Ain Md Saukeri
由: Md Saukeri, Nazatul Ain
出版: (2017) -
Renovation works / Muhammad Faaiz Ilman Khalid
由: Khalid, Muhammad Faaiz Ilman
出版: (2015)