An empirical investigation on factors improving the execution of Key Performance Indicators (KPIs) for assessing the operational performance of PPP projects / Nor Suzila Lop
Public-Private Partnership (PPP) is sconceptualised as a performance-based procurement in which concessionaires are contracted to provide efficient facilities and services to the government. The quality of the facilities and services provided by the concessionaires will be assessed using key perform...
محفوظ في:
المؤلف الرئيسي: | Lop, Nor Suzila |
---|---|
التنسيق: | Conference or Workshop Item |
اللغة: | English |
منشور في: |
2021
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/74413/1/74413.pdf https://ir.uitm.edu.my/id/eprint/74413/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
An empirical study on the constraints of women working in Malaysia’s construction projects / Muhammad Adam Mohd Nasir and Nor Suzila Lop
بواسطة: Mohd Nasir, Muhammad Adam, وآخرون
منشور في: (2023) -
A study on inventory system in UiTM Shah Alam (main campus) / Nor Khalilah Rosli
بواسطة: Rosli, Nor Khalilah
منشور في: (2009) -
Safety awareness and malpractice scaffolding erection in high rise building / Nurul Zulaikha Alias
بواسطة: Alias, Nurul Zulaikha
منشور في: (2021) -
Procedure building plan approval in Alor Setar City Council (MBAS) / Aiman Amir Noor Shamshidi
بواسطة: Noor Shamshidi, Aiman Amir
منشور في: (2021) -
Site audit and reporting of telecommunication tower / Aiman Nurhakim Ahmad Khanzir
بواسطة: Ahmad Khanzir, Aiman Nurhakim
منشور في: (2021)