Wan Abdullah, W. Z. (2023). Supply chain integration improvement action model for contractor in industrialised building systems (IBS) projects / Wan Zukri Wan Abdullah.
استشهاد بنمط شيكاغوWan Abdullah, Wan Zukri. Supply Chain Integration Improvement Action Model for Contractor in Industrialised Building Systems (IBS) Projects / Wan Zukri Wan Abdullah. 2023.
MLA استشهادWan Abdullah, Wan Zukri. Supply Chain Integration Improvement Action Model for Contractor in Industrialised Building Systems (IBS) Projects / Wan Zukri Wan Abdullah. 2023.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.