Factors influencing the level of readiness of designers in implementing IBS construction projects / Imilia Husna Dilah and Wan Norizan Wan Ismail
IBS is a system and technique that require as little additional site work as possible. Their components can be manufactured on-site or off-site before being transported, positioned, and assembled into a structure. Many incentives have been given to encourage the adoption of IBS in Malaysian construc...
محفوظ في:
المؤلفون الرئيسيون: | Dilah, Imilia Husna, Wan Ismail, Wan Norizan |
---|---|
التنسيق: | Conference or Workshop Item |
اللغة: | English |
منشور في: |
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/94903/1/94903.pdf https://ir.uitm.edu.my/id/eprint/94903/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Contractual behaviour framework for successful civil engineering projects / Wan Norizan Wan Ismail
بواسطة: Wan Ismail, Wan Norizan
منشور في: (2021) -
The influence of project characteristics on contractual behaviour of key participants in civil engineering projects / Wan Norizan Wan Ismail and Hamimah Adnan
بواسطة: Wan Ismail, Wan Norizan, وآخرون
منشور في: (2020) -
Unmanned aerial system (UAS) for monitoring and communication in IBS construction project / Anis Sofea Mad Said and Wan Akmal Zahri Wan Zaharuddin
بواسطة: Mad Said, Anis Sofea, وآخرون
منشور في: (2019) -
The influence of client attributes on project success : a focus on the briefing stage / Norizan Ahmad
بواسطة: Ahmad, Norizan
منشور في: (2008) -
A study on the readiness of building owner in enhancing building performance by embracing green building concept / Wan Nur Farahin Wan Ismail
بواسطة: Wan Ismail, Wan Nur Farahin
منشور في: (2015)