Factors influencing the level of readiness of designers in implementing IBS construction projects / Imilia Husna Dilah and Wan Norizan Wan Ismail

IBS is a system and technique that require as little additional site work as possible. Their components can be manufactured on-site or off-site before being transported, positioned, and assembled into a structure. Many incentives have been given to encourage the adoption of IBS in Malaysian construc...

全面介紹

Saved in:
書目詳細資料
Main Authors: Dilah, Imilia Husna, Wan Ismail, Wan Norizan
格式: Conference or Workshop Item
語言:English
出版: 2023
主題:
在線閱讀:https://ir.uitm.edu.my/id/eprint/94903/1/94903.pdf
https://ir.uitm.edu.my/id/eprint/94903/
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!