Implementation of 4D/BIM in the Iraqi construction industry

Building information modelling (BIM) is a new technique, which has been innovated from the traditional method to a modern form. BIM should be classified as a modern technique, since it is dealing with digital data. 3D BIM with its time schedule results on 4D/BIM is represented by softwares, such as...

全面介紹

Saved in:
書目詳細資料
Main Authors: Hamada, Hussein M., Ahmad Tarmizi, Haron, Zahrizan, Zakaria, Humada, Ali Mahmood
格式: Article
語言:English
出版: Inderscience Publishers 2017
主題:
在線閱讀:http://umpir.ump.edu.my/id/eprint/28120/1/Implementation%20of%204D_BIM%20in%20the%20Iraqi%20construction%20industry.pdf
http://umpir.ump.edu.my/id/eprint/28120/
https://doi.org/10.1504/IJESMS.2017.087556
https://doi.org/10.1504/IJESMS.2017.087556
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:Building information modelling (BIM) is a new technique, which has been innovated from the traditional method to a modern form. BIM should be classified as a modern technique, since it is dealing with digital data. 3D BIM with its time schedule results on 4D/BIM is represented by softwares, such as Naviswork and Syncro, which has an advantage to solve most of the project issues such as clash detection among projects components, visualisation to projects tasks, and other benefits. The aim of this current study is to find out the benefits and challenges of 4D/BIM implementation in the construction projects. The data collection method in this research is done by conducting semi-structured interviews (SSIs) with the senior civil engineer in Al-Najaf hospital project in Iraq, in addition to that there is the extensive literature review about the benefits, challenges and obstacles in the implementation of 4D/BIM. Analysis of the results was conducted by adopting content analysis method (CAM). The results proved that the construction industry in Iraq needs to further support from the government by increasing awareness and financial support for construction companies.