Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued i...
محفوظ في:
المؤلفون الرئيسيون: | Baharom, Md Nor Ramdon, Mahmod, Luqman Hakim, Zainal, Zainab, Ullah, Irshad, Ali, Irfan |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Asian Research Publishing Network (ARPN)
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf http://eprints.uthm.edu.my/5639/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring approach
بواسطة: Mahmod, Luqman Hakim
منشور في: (2012) -
Magnetic field measurement from 132 kv and 275 kv overhead transmission lines within residential area
بواسطة: Baharom, Md Nor Ramdon, وآخرون
منشور في: (2016) -
Voltage uprating of existing 275kV overhead transmission line tower for increasing the power transfer capability
بواسطة: Mat Yamin, Mohd Khairuddin
منشور في: (2012) -
Lighting performance study on existing 275KV overhead line in TNB system
بواسطة: Thamodharan, Muralitharan
منشور في: (2013) -
Magnetic field measurement from 132/275 KV overhead power lines
بواسطة: Jimbin, V. S., وآخرون
منشور في: (2017)