Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It...
Saved in:
Main Authors: | , , , , |
---|---|
格式: | Article |
語言: | English |
出版: |
Penerbit UTM Press
2015
|
主題: | |
在線閱讀: | http://repo.uum.edu.my/16144/1/55.pdf http://repo.uum.edu.my/16144/ http://www.jurnalteknologi.utm.my/index.php/jurnalteknologi/article/view/6046 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|