Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)

The Malaysian government has taken the initiative of implementing Industrialized Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works.It...

全面介紹

Saved in:
書目詳細資料
Main Authors: Osman, Wan Nadzri, Mohd Nawi, Mohd Nasrun, Anuar, Herman Shah, Radzuan, Kamaruddin, Osman, N. N.
格式: Article
語言:English
出版: Penerbit UTM Press 2015
主題:
在線閱讀:http://repo.uum.edu.my/16144/1/55.pdf
http://repo.uum.edu.my/16144/
http://www.jurnalteknologi.utm.my/index.php/jurnalteknologi/article/view/6046
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!