Improving team integration in Malaysian IBS construction projects: A partnering approach
Due to the combination of problems and issues that arose using traditional construction methods, such as fragmentation, time delay, wastages, lack of sustainability etc, the Malaysian Government proposed a new solution through industrialisation technology called Industrialised Building System (IBS)...
保存先:
主要な著者: | Abdul Nifa, Faizatul Akmar, Mohd Nawi, Mohd Nasrun, Lee, Angela |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
UUM College of Business
2012
|
主題: | |
オンライン・アクセス: | http://repo.uum.edu.my/17843/1/JTOM%207%201%20%201-16.pdf http://repo.uum.edu.my/17843/ http://jtom.stmlportal.net/uncategorized/volume-7-number-1-july-2012/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
著者:: Mohd Nawi, Mohd Nasrun, 等
出版事項: (2012) -
Improving construction industry through Integrated Project Delivery (IPD)
著者:: Abdul Rahim, Syukran, 等
出版事項: (2015) -
Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
著者:: Mohd Nawi, Mohd Nasrun, 等
出版事項: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
著者:: Mohd Nawi, Mohd Nasrun, 等
出版事項: (2013) -
Effective partnering in construction: A critical literature review
著者:: Abdul Nifa, Faizatul Akmar, 等
出版事項: (2010)