Improving team integration in Malaysian IBS construction projects: A partnering approach
Due to the combination of problems and issues that arose using traditional construction methods, such as fragmentation, time delay, wastages, lack of sustainability etc, the Malaysian Government proposed a new solution through industrialisation technology called Industrialised Building System (IBS)...
محفوظ في:
المؤلفون الرئيسيون: | Abdul Nifa, Faizatul Akmar, Mohd Nawi, Mohd Nasrun, Lee, Angela |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
UUM College of Business
2012
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://repo.uum.edu.my/17843/1/JTOM%207%201%20%201-16.pdf http://repo.uum.edu.my/17843/ http://jtom.stmlportal.net/uncategorized/volume-7-number-1-july-2012/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2012) -
Improving construction industry through Integrated Project Delivery (IPD)
بواسطة: Abdul Rahim, Syukran, وآخرون
منشور في: (2015) -
Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2013) -
Effective partnering in construction: A critical literature review
بواسطة: Abdul Nifa, Faizatul Akmar, وآخرون
منشور في: (2010)