Improving team integration in Malaysian IBS construction projects: A partnering approach
Due to the combination of problems and issues that arose using traditional construction methods, such as fragmentation, time delay, wastages, lack of sustainability etc, the Malaysian Government proposed a new solution through industrialisation technology called Industrialised Building System (IBS)...
Saved in:
Main Authors: | Abdul Nifa, Faizatul Akmar, Mohd Nawi, Mohd Nasrun, Lee, Angela |
---|---|
格式: | Article |
语言: | English |
出版: |
UUM College of Business
2012
|
主题: | |
在线阅读: | http://repo.uum.edu.my/17843/1/JTOM%207%201%20%201-16.pdf http://repo.uum.edu.my/17843/ http://jtom.stmlportal.net/uncategorized/volume-7-number-1-july-2012/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2012) -
Improving construction industry through Integrated Project Delivery (IPD)
由: Abdul Rahim, Syukran, et al.
出版: (2015) -
Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2013) -
Effective partnering in construction: A critical literature review
由: Abdul Nifa, Faizatul Akmar, et al.
出版: (2010)