Doctrine of laches and its application in actions founded on contract in Malaysia

In a remedial contractual action, the limitation period plays an important part before one commences an action against the defaulting party to a contract. The provision of a limitation period to enforce a contract is found in s 6 of the Limitation Act 1953 ('the Act'). By virtue of this pr...

全面介绍

Saved in:
书目详细资料
主要作者: Md Dahlan, Nuarrual Hilal
格式: Article
语言:English
出版: Lexisnexis Malaysia Sdn. Bhd 2002
主题:
在线阅读:http://repo.uum.edu.my/7442/1/B2.pdf
http://repo.uum.edu.my/7442/
http://www.lexisnexis.com/my/legal/
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:In a remedial contractual action, the limitation period plays an important part before one commences an action against the defaulting party to a contract. The provision of a limitation period to enforce a contract is found in s 6 of the Limitation Act 1953 ('the Act'). By virtue of this provision, one has to commence remedial action either in the form of specific performance or damages within six years from the date of accrual of the cause of action, failing which his action is deemed to have failed and shall be struck out by the court. Apart from this, at common law and in statutory footing under the Malaysian Limitation Act 1953 (Act 254), there is another equitable doctrine that could affect the plaintiffs action. This doctrine is called the doctrine of laches. In short, this doctrine states that if the plaintiff commences an action with unreasonable delay (laches) after the accrual of the cause of action, his action will be defeated.