Investigating design changes in Malaysian building projects
The complexity and uncertainties associated with construction projects mean that contracts invariably provide sufficient flexibility for changes in design as the work proceeds. However, the concomitant effects of this arrangement often cause time and cost control to be adversely affected–resulting i...
Saved in:
Main Authors: | Yap, Jeffrey Boon Hui, Skitmore, Martin |
---|---|
Format: | Article |
Published: |
Taylor & Francis
2018
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/20312/ https://doi.org/10.1080/17452007.2017.1384714 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Exploring the underlying factors inducing design changes during building production
by: Yap, Jeffrey Boon Hui, et al.
Published: (2018) -
The study of the effectiveness of design and build (D&B) procurement method in Malaysia
by: Yap, Jeffrey Boon Hui
Published: (2003) -
Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
by: Yap, Jeffrey Boon Hui, et al.
Published: (2018) -
Knowledge modelling for contract disputes and change control
by: Wang, Chen, et al.
Published: (2019) -
Interior design and construction project management: performance and productivity in Malaysian building industry
by: Jasmani, Ismail
Published: (2016)