Delay mitigation strategies and the implication on the construction industry: A systematic literature review

Every project’s goal has always been to be successful. Failure to complete projects on time has become a major problem in the last few decades. Construction delays are a common and serious problem that needs to be investigated further. This issue has implications for the construction industry and th...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: Abd Aziz, Norazlin, Mohd Rahim, Faizul Azli, Aziz, Nur Mardhiyah
التنسيق: مقال
منشور في: Malaysian Institute Of Planners 2022
الموضوعات:
الوصول للمادة أونلاين:http://eprints.um.edu.my/44047/
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my.um.eprints.44047
record_format eprints
spelling my.um.eprints.440472023-12-01T03:33:04Z http://eprints.um.edu.my/44047/ Delay mitigation strategies and the implication on the construction industry: A systematic literature review Abd Aziz, Norazlin Mohd Rahim, Faizul Azli Aziz, Nur Mardhiyah TH Building construction Every project’s goal has always been to be successful. Failure to complete projects on time has become a major problem in the last few decades. Construction delays are a common and serious problem that needs to be investigated further. This issue has implications for the construction industry and the economy’s growth, as well as the long-term development of countries. Many studies have not highlighted the strategies implemented by organisations to lessen the impact of project delays. As such, a systematic literature analysis (SLR) was performed in this study by selecting publications of articles from indexed journals on the Web of Science and Scopus to identify the efficacy of strategies utilised when mitigating problems that postpone the overall construction. The method applied for this SLR is using the Reporting Standards for Systematic Evidence Syntheses (ROSES) analysis protocol. Through this protocol, several steps need to be followed accordingly to acquire an accurate number of articles that have to be reviewed. The findings identified five leading aspects of strategies that should be adopted to reduce construction project delays, namely: communication; management; information systems and technology; enforcement of law and order; and financials. The implications of these strategies are also discussed in this research. © 2022 by MIP. Malaysian Institute Of Planners 2022 Article PeerReviewed Abd Aziz, Norazlin and Mohd Rahim, Faizul Azli and Aziz, Nur Mardhiyah (2022) Delay mitigation strategies and the implication on the construction industry: A systematic literature review. Planning Malaysia, 20 (4). 223 -234. ISSN 16756215, DOI https://doi.org/10.21837/pm.v20i24.1199 <https://doi.org/10.21837/pm.v20i24.1199>. 10.21837/pm.v20i24.1199
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic TH Building construction
spellingShingle TH Building construction
Abd Aziz, Norazlin
Mohd Rahim, Faizul Azli
Aziz, Nur Mardhiyah
Delay mitigation strategies and the implication on the construction industry: A systematic literature review
description Every project’s goal has always been to be successful. Failure to complete projects on time has become a major problem in the last few decades. Construction delays are a common and serious problem that needs to be investigated further. This issue has implications for the construction industry and the economy’s growth, as well as the long-term development of countries. Many studies have not highlighted the strategies implemented by organisations to lessen the impact of project delays. As such, a systematic literature analysis (SLR) was performed in this study by selecting publications of articles from indexed journals on the Web of Science and Scopus to identify the efficacy of strategies utilised when mitigating problems that postpone the overall construction. The method applied for this SLR is using the Reporting Standards for Systematic Evidence Syntheses (ROSES) analysis protocol. Through this protocol, several steps need to be followed accordingly to acquire an accurate number of articles that have to be reviewed. The findings identified five leading aspects of strategies that should be adopted to reduce construction project delays, namely: communication; management; information systems and technology; enforcement of law and order; and financials. The implications of these strategies are also discussed in this research. © 2022 by MIP.
format Article
author Abd Aziz, Norazlin
Mohd Rahim, Faizul Azli
Aziz, Nur Mardhiyah
author_facet Abd Aziz, Norazlin
Mohd Rahim, Faizul Azli
Aziz, Nur Mardhiyah
author_sort Abd Aziz, Norazlin
title Delay mitigation strategies and the implication on the construction industry: A systematic literature review
title_short Delay mitigation strategies and the implication on the construction industry: A systematic literature review
title_full Delay mitigation strategies and the implication on the construction industry: A systematic literature review
title_fullStr Delay mitigation strategies and the implication on the construction industry: A systematic literature review
title_full_unstemmed Delay mitigation strategies and the implication on the construction industry: A systematic literature review
title_sort delay mitigation strategies and the implication on the construction industry: a systematic literature review
publisher Malaysian Institute Of Planners
publishDate 2022
url http://eprints.um.edu.my/44047/
_version_ 1784511896912658432
score 13.252575