Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study

In Malaysia, Building Information Modelling (BIM) has recently gained attraction from construction players and some of them have applied it to several projects. By utilising the BIM process, the construction players have the opportunity to plan, coordinate and design in an integrated approach. Thi...

全面介紹

Saved in:
書目詳細資料
Main Authors: Zahrizan, Zakaria, Nasly, Mohamed Ali, Ahmad Tarmizi, Haron, Amanda, Marshall-Ponting, Zuhairi, Abd. Hamid
格式: Article
語言:English
出版: 2014
主題:
在線閱讀:http://umpir.ump.edu.my/id/eprint/7484/1/fkasa-2014-zahrizan-Exploring%20the%20barriers.pdf
http://umpir.ump.edu.my/id/eprint/7484/
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id my.ump.umpir.7484
record_format eprints
spelling my.ump.umpir.74842018-02-05T06:03:53Z http://umpir.ump.edu.my/id/eprint/7484/ Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study Zahrizan, Zakaria Nasly, Mohamed Ali Ahmad Tarmizi, Haron Amanda, Marshall-Ponting Zuhairi, Abd. Hamid TA Engineering (General). Civil engineering (General) In Malaysia, Building Information Modelling (BIM) has recently gained attraction from construction players and some of them have applied it to several projects. By utilising the BIM process, the construction players have the opportunity to plan, coordinate and design in an integrated approach. This is one of the many benefits that they could gain and resulting in increased productivity. Despite these benefits, the implementation of BIM in the Malaysian construction industry is still lagging behind Singapore, for instance. Thus, it warrants a study such as the present to determine what are the actual barriers that hamper its implementation and what are the driving factors that could enhance its pace of implementation in the Malaysian construction industry. In this study, a questionnaire survey based on Convenience Sampling Method was carried out to gather the possible barriers and driving factors for BIM implementation among the Malaysian construction players. Additionally, Relative Importance Indices (RII) were used to analyse the data obtained and to identify those barriers and driving factors for the implementation of BIM in this country. Consequently, results of this study revealed that the main barriers for implementing the BIM are: 1) Lack of knowledge about BIM, 2) Reluctance and/or no insistence shown by the Malaysian construction industry players (Clients, Contractors and Consultants alike) on the use or implementation of BIM. The driving factors, on the other hand, that could lead to the speeding up of the implementation of BIM are: 1) Support and enforcing the implementation of BIM by the Government, 2) promote BIM training program and 3) Initiatives of senior management of the related industry players. In conclusion, for successful wide spread application of BIM in Malaysia, a good push from the government alone is far from enough. All other construction industry players mentioned must assume their roles well in promoting the use of BIM in their construction projects. 2014 Article PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/7484/1/fkasa-2014-zahrizan-Exploring%20the%20barriers.pdf Zahrizan, Zakaria and Nasly, Mohamed Ali and Ahmad Tarmizi, Haron and Amanda, Marshall-Ponting and Zuhairi, Abd. Hamid (2014) Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study. The Institution of Engineers, Malaysia, 75 (1). pp. 1-10. (Published)
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Zahrizan, Zakaria
Nasly, Mohamed Ali
Ahmad Tarmizi, Haron
Amanda, Marshall-Ponting
Zuhairi, Abd. Hamid
Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
description In Malaysia, Building Information Modelling (BIM) has recently gained attraction from construction players and some of them have applied it to several projects. By utilising the BIM process, the construction players have the opportunity to plan, coordinate and design in an integrated approach. This is one of the many benefits that they could gain and resulting in increased productivity. Despite these benefits, the implementation of BIM in the Malaysian construction industry is still lagging behind Singapore, for instance. Thus, it warrants a study such as the present to determine what are the actual barriers that hamper its implementation and what are the driving factors that could enhance its pace of implementation in the Malaysian construction industry. In this study, a questionnaire survey based on Convenience Sampling Method was carried out to gather the possible barriers and driving factors for BIM implementation among the Malaysian construction players. Additionally, Relative Importance Indices (RII) were used to analyse the data obtained and to identify those barriers and driving factors for the implementation of BIM in this country. Consequently, results of this study revealed that the main barriers for implementing the BIM are: 1) Lack of knowledge about BIM, 2) Reluctance and/or no insistence shown by the Malaysian construction industry players (Clients, Contractors and Consultants alike) on the use or implementation of BIM. The driving factors, on the other hand, that could lead to the speeding up of the implementation of BIM are: 1) Support and enforcing the implementation of BIM by the Government, 2) promote BIM training program and 3) Initiatives of senior management of the related industry players. In conclusion, for successful wide spread application of BIM in Malaysia, a good push from the government alone is far from enough. All other construction industry players mentioned must assume their roles well in promoting the use of BIM in their construction projects.
format Article
author Zahrizan, Zakaria
Nasly, Mohamed Ali
Ahmad Tarmizi, Haron
Amanda, Marshall-Ponting
Zuhairi, Abd. Hamid
author_facet Zahrizan, Zakaria
Nasly, Mohamed Ali
Ahmad Tarmizi, Haron
Amanda, Marshall-Ponting
Zuhairi, Abd. Hamid
author_sort Zahrizan, Zakaria
title Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
title_short Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
title_full Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
title_fullStr Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
title_full_unstemmed Exploring the Barriers and Driving Factors in Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry: A Preliminary Study
title_sort exploring the barriers and driving factors in implementing building information modelling (bim) in the malaysian construction industry: a preliminary study
publishDate 2014
url http://umpir.ump.edu.my/id/eprint/7484/1/fkasa-2014-zahrizan-Exploring%20the%20barriers.pdf
http://umpir.ump.edu.my/id/eprint/7484/
_version_ 1822916548177690624
score 13.252575