Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project

Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary study with 2 Interface Managers involved in LRT3 project, it has been foun...

Full description

Saved in:
Bibliographic Details
Main Authors: Soon Ern, Peniel Ang, Nordin, Norimran, Saparudin, Faiz Asraf, Kai Len, Tsai, Kasim, Narimah, Osman, Mohamad Hairi
Format: Article
Language:English
Published: Aip Publishing 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/12411/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf
http://eprints.uthm.edu.my/12411/
https://doi.org/10.1063/5.0199315
Tags: Add Tag
No Tags, Be the first to tag this record!