E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM
This project applied the Database Application Life Cycle approach in database planning, design and administration for a web-based e-learning Readiness Survey and Index System (eLRSIS). Providing real-time information on eight key factors of e-Learning readiness (Psychological, Sociological, Environ...
保存先:
第一著者: | |
---|---|
フォーマット: | 学位論文 |
言語: | English English |
出版事項: |
2003
|
主題: | |
オンライン・アクセス: | http://etd.uum.edu.my/1171/1/WOON_MOONG_VOOI.pdf http://etd.uum.edu.my/1171/2/1.WOON_MOONG_VOOI.pdf http://etd.uum.edu.my/1171/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
id |
my.uum.etd.1171 |
---|---|
record_format |
eprints |
spelling |
my.uum.etd.11712013-07-24T12:10:45Z http://etd.uum.edu.my/1171/ E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM Woon, Moong Vooi LB1025-1050.75 Teaching (Principles and practice) This project applied the Database Application Life Cycle approach in database planning, design and administration for a web-based e-learning Readiness Survey and Index System (eLRSIS). Providing real-time information on eight key factors of e-Learning readiness (Psychological, Sociological, Environmental, Human resource, Financial, Technology, Equipment and Content) and the resultant Big-L index, eLRSIS is useful in the management of fast-changing ICT resources for e-learning provision and support. Results from eLRSIS could reduce guesswork and guide the decision makers at the University Teaching & Learning Centre of UUM in identifying targets and establishing corrective measures through change management programs, ultimately enhancing the performance of e-learning efforts and helps UUM in its quest of transforming into an e-university. Using UUM as case, a pilot-test with the prototype of eLRSIS had collected some data from the staff in the School of Economics (SE) and the School of Information Technology (STM). Preliminary results showed that overall the academic staff of SE and STM have fared weakly in terms of Psychological readiness, Financial readiness and Equipment rea.diness in e-learning, while scoring averagely in Sociological readiness, Human resource readiness, Environmental readiness, Technology readiness and Content readiness in e-Learning. 2003-12-24 Thesis NonPeerReviewed application/pdf en http://etd.uum.edu.my/1171/1/WOON_MOONG_VOOI.pdf application/pdf en http://etd.uum.edu.my/1171/2/1.WOON_MOONG_VOOI.pdf Woon, Moong Vooi (2003) E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM. Masters thesis, Universiti Utara Malaysia. |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Electronic Theses |
url_provider |
http://etd.uum.edu.my/ |
language |
English English |
topic |
LB1025-1050.75 Teaching (Principles and practice) |
spellingShingle |
LB1025-1050.75 Teaching (Principles and practice) Woon, Moong Vooi E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM |
description |
This project applied the Database Application Life Cycle approach in database planning, design and administration for a web-based e-learning Readiness Survey and Index System (eLRSIS). Providing real-time information on eight key factors of e-Learning readiness (Psychological,
Sociological, Environmental, Human resource, Financial, Technology, Equipment and Content) and the resultant Big-L index, eLRSIS is useful in the management of fast-changing ICT resources for e-learning provision and support. Results from eLRSIS could reduce guesswork and guide the decision makers at the University Teaching & Learning Centre of UUM in identifying targets and establishing corrective measures through change management programs, ultimately enhancing the performance of e-learning efforts and helps UUM in its quest of transforming into an e-university. Using UUM as case, a pilot-test with the prototype of eLRSIS had collected some data from the staff in the School of Economics (SE) and the School of Information Technology (STM). Preliminary results showed that overall the academic staff of SE and STM have fared weakly in terms of Psychological readiness, Financial readiness and Equipment rea.diness in e-learning, while scoring averagely in Sociological readiness, Human resource readiness, Environmental readiness, Technology readiness and Content readiness in e-Learning.
|
format |
Thesis |
author |
Woon, Moong Vooi |
author_facet |
Woon, Moong Vooi |
author_sort |
Woon, Moong Vooi |
title |
E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM |
title_short |
E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM |
title_full |
E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM |
title_fullStr |
E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM |
title_full_unstemmed |
E-Readiness as a Tool for ICT Management in an E-University : The Case of UUM |
title_sort |
e-readiness as a tool for ict management in an e-university : the case of uum |
publishDate |
2003 |
url |
http://etd.uum.edu.my/1171/1/WOON_MOONG_VOOI.pdf http://etd.uum.edu.my/1171/2/1.WOON_MOONG_VOOI.pdf http://etd.uum.edu.my/1171/ |
_version_ |
1644276373298085888 |
score |
13.252575 |