Enhancement of constructability concept: An experience in offsite Malaysia construction industry
In the construction process of a traditional contracting system, most design drawings and specifications that produced by the design engineers are tend to be performance oriented, specifying an end result and materials, while leaves the means and methods for constructing the work to the contractor....
محفوظ في:
المؤلفون الرئيسيون: | Mohd Nawi, Mohd Nasrun, Mohamad Kamar, Kamarul Anuar, Abdullah, Mohd Rodzi, Haron, Ahmad Tarmizi, Lee, Angela, Arif, Mohammed |
---|---|
التنسيق: | Conference or Workshop Item |
اللغة: | English |
منشور في: |
2009
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://repo.uum.edu.my/10222/1/1a.pdf http://repo.uum.edu.my/10222/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2011) -
Modern method of construction: An experience from UK construction industry
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2014) -
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2012) -
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2014) -
Assessing the sustainable construction of large construction companies in Malaysia
بواسطة: Bamgbade, Jibril Adewale, وآخرون
منشور في: (2016)