Enhancement of constructability concept: An experience in offsite Malaysia construction industry
In the construction process of a traditional contracting system, most design drawings and specifications that produced by the design engineers are tend to be performance oriented, specifying an end result and materials, while leaves the means and methods for constructing the work to the contractor....
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Mohamad Kamar, Kamarul Anuar, Abdullah, Mohd Rodzi, Haron, Ahmad Tarmizi, Lee, Angela, Arif, Mohammed |
---|---|
格式: | Conference or Workshop Item |
语言: | English |
出版: |
2009
|
主题: | |
在线阅读: | http://repo.uum.edu.my/10222/1/1a.pdf http://repo.uum.edu.my/10222/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011) -
Modern method of construction: An experience from UK construction industry
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2014) -
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2012) -
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2014) -
Assessing the sustainable construction of large construction companies in Malaysia
由: Bamgbade, Jibril Adewale, et al.
出版: (2016)