Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...
محفوظ في:
المؤلفون الرئيسيون: | Mohd Nawi, Mohd Nasrun, Haron, Ahmad Tarmizi, Abd Hamid, Zuhairi, Mohamad Kamar, Kamarul Anuar, Baharuddin, Yusnizam |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Construction Research Institute of Malaysia
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf http://repo.uum.edu.my/18854/ http://www.cream.my/publication/download-mcrj.html |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
بواسطة: Mohd Nasrun, Mohd Nawi, وآخرون
منشور في: (2014) -
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
بواسطة: Osman, Wan Nadzri, وآخرون
منشور في: (2015) -
Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
بواسطة: Osman, Wan Nadzri, وآخرون
منشور في: (2015) -
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2011) -
Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
بواسطة: Kaini, Iman
منشور في: (2013)