Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Haron, Ahmad Tarmizi, Abd Hamid, Zuhairi, Mohamad Kamar, Kamarul Anuar, Baharuddin, Yusnizam |
---|---|
格式: | Article |
语言: | English |
出版: |
Construction Research Institute of Malaysia
2014
|
主题: | |
在线阅读: | http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf http://repo.uum.edu.my/18854/ http://www.cream.my/publication/download-mcrj.html |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
由: Mohd Nasrun, Mohd Nawi, et al.
出版: (2014) -
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
由: Osman, Wan Nadzri, et al.
出版: (2015) -
Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
由: Osman, Wan Nadzri, et al.
出版: (2015) -
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011) -
Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
由: Kaini, Iman
出版: (2013)