Dilapidation survey of basement for demolished work / Raden Heedhir Abdul Rahman
Practical report is made about the process I have been through for 4 month of practical training. This report is about all things I done from the first day I come to work at the practical training place until the last day of my practical training. This report consists of four parts which is the comp...
Saved in:
主要作者: | |
---|---|
格式: | Student Project |
語言: | English |
出版: |
2015
|
主題: | |
在線閱讀: | https://ir.uitm.edu.my/id/eprint/60874/1/60874.pdf https://ir.uitm.edu.my/id/eprint/60874/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|