Dilapidation survey of basement for demolished work / Raden Heedhir Abdul Rahman
Practical report is made about the process I have been through for 4 month of practical training. This report is about all things I done from the first day I come to work at the practical training place until the last day of my practical training. This report consists of four parts which is the comp...
Saved in:
Main Author: | Abdul Rahman, Raden Heedhir |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/60874/1/60874.pdf https://ir.uitm.edu.my/id/eprint/60874/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pre and post dilapidation survey at Jalan Gombak / Safiah Che Ab Rahman
by: Ab Rahman, Safiah Che
Published: (2015) -
Pre-construction and post construction dilapidation survey / Muaz Ghazali
by: Ghazali, Muaz
Published: (2017) -
Dilapidation survey/ Manzurul Hasan Marzuki
by: Marzuki, Manzurul Hasan
Published: (2015) -
Repairing work / Nazatul Ain Md Saukeri
by: Md Saukeri, Nazatul Ain
Published: (2017) -
Renovation works / Muhammad Faaiz Ilman Khalid
by: Khalid, Muhammad Faaiz Ilman
Published: (2015)