Dilapidation survey of basement for demolished work / Raden Heedhir Abdul Rahman
Practical report is made about the process I have been through for 4 month of practical training. This report is about all things I done from the first day I come to work at the practical training place until the last day of my practical training. This report consists of four parts which is the comp...
保存先:
第一著者: | Abdul Rahman, Raden Heedhir |
---|---|
フォーマット: | Student Project |
言語: | English |
出版事項: |
2015
|
主題: | |
オンライン・アクセス: | https://ir.uitm.edu.my/id/eprint/60874/1/60874.pdf https://ir.uitm.edu.my/id/eprint/60874/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Pre and post dilapidation survey at Jalan Gombak / Safiah Che Ab Rahman
著者:: Ab Rahman, Safiah Che
出版事項: (2015) -
Pre-construction and post construction dilapidation survey / Muaz Ghazali
著者:: Ghazali, Muaz
出版事項: (2017) -
Dilapidation survey/ Manzurul Hasan Marzuki
著者:: Marzuki, Manzurul Hasan
出版事項: (2015) -
Repairing work / Nazatul Ain Md Saukeri
著者:: Md Saukeri, Nazatul Ain
出版事項: (2017) -
Renovation works / Muhammad Faaiz Ilman Khalid
著者:: Khalid, Muhammad Faaiz Ilman
出版事項: (2015)