Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country

In the area of the construction sector, the primary concern is economic growth. There are many issues and challenges associated with it. The growth and rapid development of this industry put their players, mainly the construction firms feeling the heat by competing with each other. The main challeng...

Full description

Saved in:
Bibliographic Details
Main Authors: Yip, Raymond Hock Seng, Anuar, Herman Shah
Format: Article
Language:English
Published: UUM Press 2020
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/30046/1/GBMR%2012%2001%202020%2072-88.pdf
https://doi.org/10.32890/gbmr2020.12.1.4
https://repo.uum.edu.my/id/eprint/30046/
https://e-journal.uum.edu.my/index.php/gbmr/article/view/gbmr2020.12.1.4
https://doi.org/10.32890/gbmr2020.12.1.4
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.30046
record_format eprints
spelling my.uum.repo.300462023-11-28T11:40:41Z https://repo.uum.edu.my/id/eprint/30046/ Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country Yip, Raymond Hock Seng Anuar, Herman Shah HD28 Management. Industrial Management In the area of the construction sector, the primary concern is economic growth. There are many issues and challenges associated with it. The growth and rapid development of this industry put their players, mainly the construction firms feeling the heat by competing with each other. The main challenge is the completion period for a particular project. This study was done in Manila, Philippines, where Design and Build (D&B) method has gained much interest and considered very important today. The rise of new innovative systems saw the emergence of new factors in the construction industry that will become future adoption. This study focuses on factors affecting the successful completion period of the construction industry, whereby it is very crucial for the country's economic and market development. A quantitative research methodology was applied in this study. A total of 967 survey questionnaires sent out, and only 396 respondents fit to be analysed. Respondents involved were contractors, consultants, and developers. It was learned that critical success factors in project management play significant roles in driving projects to examine the determinants of success completion time of Design & Build construction projects. Findings from this study shall be used by the authority in drafting a policy guideline for future construction development. It is hoped that this study provides a better understanding of construction challenges for future undertaking. UUM Press 2020 Article PeerReviewed application/pdf en cc4_by https://repo.uum.edu.my/id/eprint/30046/1/GBMR%2012%2001%202020%2072-88.pdf Yip, Raymond Hock Seng and Anuar, Herman Shah (2020) Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country. Global Business Management Review (GBMR), 12 (1). pp. 72-88. ISSN 2180-2416 https://e-journal.uum.edu.my/index.php/gbmr/article/view/gbmr2020.12.1.4 https://doi.org/10.32890/gbmr2020.12.1.4 https://doi.org/10.32890/gbmr2020.12.1.4
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutional Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Yip, Raymond Hock Seng
Anuar, Herman Shah
Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
description In the area of the construction sector, the primary concern is economic growth. There are many issues and challenges associated with it. The growth and rapid development of this industry put their players, mainly the construction firms feeling the heat by competing with each other. The main challenge is the completion period for a particular project. This study was done in Manila, Philippines, where Design and Build (D&B) method has gained much interest and considered very important today. The rise of new innovative systems saw the emergence of new factors in the construction industry that will become future adoption. This study focuses on factors affecting the successful completion period of the construction industry, whereby it is very crucial for the country's economic and market development. A quantitative research methodology was applied in this study. A total of 967 survey questionnaires sent out, and only 396 respondents fit to be analysed. Respondents involved were contractors, consultants, and developers. It was learned that critical success factors in project management play significant roles in driving projects to examine the determinants of success completion time of Design & Build construction projects. Findings from this study shall be used by the authority in drafting a policy guideline for future construction development. It is hoped that this study provides a better understanding of construction challenges for future undertaking.
format Article
author Yip, Raymond Hock Seng
Anuar, Herman Shah
author_facet Yip, Raymond Hock Seng
Anuar, Herman Shah
author_sort Yip, Raymond Hock Seng
title Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
title_short Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
title_full Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
title_fullStr Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
title_full_unstemmed Review of Design and Build Construction: Descriptive Statistics in one of the South East Asia country
title_sort review of design and build construction: descriptive statistics in one of the south east asia country
publisher UUM Press
publishDate 2020
url https://repo.uum.edu.my/id/eprint/30046/1/GBMR%2012%2001%202020%2072-88.pdf
https://doi.org/10.32890/gbmr2020.12.1.4
https://repo.uum.edu.my/id/eprint/30046/
https://e-journal.uum.edu.my/index.php/gbmr/article/view/gbmr2020.12.1.4
https://doi.org/10.32890/gbmr2020.12.1.4
_version_ 1783881399199072256
score 13.252575